The Police Station Parking Lot Project is substantially complete and open to the public for police business. There is a punch list of items left for the contractor, Unified Excavating, Inc. to complete consisting mainly of landscaping and cleanup work. 
Overview
Most of the drainage system proposed for the new parking lot has been completed. The contractor, Unified Contracting, Inc., relocated an existing hydrant, installed granite curbing and has formed and poured concrete for several of the proposed and existing accessible ramps. This week, the contractor will be installing the light pole bases, PVC conduits for the EV charging station and completing the accessible ramps.