Most of the drainage system proposed for the new parking lot has been completed.  The contractor, Unified Contracting, Inc., relocated an existing hydrant, installed granite curbing and has formed and poured concrete for several of the proposed and existing accessible ramps.  This week, the contractor will be installing the light pole bases, PVC conduits for the EV charging station and completing the accessible ramps.  

If you have any questions, at any time during the duration of the project, feel free to call the DPW Engineering Division at 781-235-7600, extension 3315.