Middle School Parking Lot Improvements Project

The contractor, Lorusso Corporation, continues to work on the Middle School Calvin Road Main Lot and the Donizetti Street Lot.  The contractor is working on the installation of the stormwater drainage system, which includes a bio-swale, infiltration systems and stormwater pipe network.  Electric conduit work has been completed for the EV charging station and a single parking lot light.  Curbing and walkway work will begin in two weeks and take approximately 5 days to complete.  The Town is working closely with the contractor to keep the work on schedule. 

 If you have any questions, at any time during the duration of the project, feel free to call the DPW Engineering Division at 781-235-7600, extension 3315.