Concept Design Options

The School Building Committee (SBC) has evaluated data generated by the professional team and feedback provided by the community to narrow a long list of concept design options to a short list of four options that will be studied in detail.

  • Addition/renovation that incorporates the front portion of the original 1938 building (Current Option 4a)
  • Addition/renovation that incorporates the front portion of the original 1938 building and attempts to preserve the white oak tree in the courtyard (Current Option 4a/5)
  • All new construction building  (Current Option 5a)
  • All new construction building that attempts to reserve the oak tree (Current Option 6)