135 Great Plain Avenue
Application Materials Submitted 3/12/18
- Cover Letter 3.8.18
- ZBA Comprehensive Permit Application
- ZBA Development Prospectus I - 3.7.2018
- ZBA Findings of Fact
- Development Team
- Location Map
- Tax Map
- Site Eligibility Approval 2.7.18
- Wavier List 3.8.18
- Project Description and Design Approach 3.8.18
- Architectural Plans
- Unit Summary Schedule 3.7.18
- Civil Engineering and Landscape Plans
- Stormwater Report
- Order of Resource Area Delineation - Wetlands
- Traffic Study prepared by Vanasse Associates
- Site Context Photos
- Wetlands Memo and Attachments 5.16.18
- Stormwater Summary Memo 5.16.18
- Resource Delineation Memo 5.16.18
- GPA Fire Access Plan 5.18.18
- ZBA Letter 5.24.18
- Traffic Letter 5.24.18
- Construction Management Plan_revised on 10.23.2019
- GPA Lighting Plan 5.23.18
- Site Light Fixtures
- Response to DPW Comments 5.31.18
- GPA WB-50 Turning Movement Plan 6.13.18
- VAI Response to Beta Comments 6.19.18
- GPA Conceptual Architecture 6.20.18
- ZBA letter 6.21.18
- Great Plain Ave Rent 6.21.18
- Stormwater Information 6.21.18
- GPA Neighborhood Context Study 6.21.18
- Response to BETA Comments 6.21.18
- Cover Letter on Plan Changes dated 9.6.18
- Revised Waiver List dated 9.6.18
- Revised Site Plans and Civil Engineering Plans dated 8.30.18
- Revised Architectural Plans 9.6.18
- Revised Landscape Plan dated 9.6.18
- Great Plain Avenue Proposed Crosswalk Design
- Gravity Sewer Study 8.15.18
- Applicant Response to PB and DRB Comments 9.17.18
Town Document and Comments
- 135 Great Plain Ave - Fire Department Review
- Beta Traffic Review Comments 5.14.18
- DRB Memo to ZBA RE 135 Great Plain 40B_FINAL
- Summary Letter- Architecture peer review
- Engineering Comments 5.29.18
- Wetlands memo signed 5.30.18
- Beta Traffic Review Response 6.7.18
- Planning Board Recommendation - 135 Great Plain Ave CP - 6-14-18
- Beta Mitigation Cost Estimate 7.11.18
- Beta Traffic Review Response7.13.18
- Engineering Response 7.17.18
- REVISED PB Recommendation 135 Great Plain Ave COMPREHENSIVE PERMIT 9.7.18
- DRB Memo to ZBA 135 Great Plain 40B_REVISED PLANS_9.13.18
- MLP Service Upgrade Plan for Abutters 9.19.18
- Board of Health Comments 9.21.18
Other Relevant Documents
- April 26, 2018 Powerpoint Presentation to ZBA
- July 17, 2018 Powerpoint Presentation to ZBA
- 135 Great Plain Avenue Comprehensive Permit Decision - Filed 11/2/2018 @(Model.BulletStyle == CivicPlus.Entities.Modules.Layout.Enums.BulletStyle.Decimal ? "ol" : "ul")>